Searching for roofing contractors near me usually means you have sheets to fit, an old roof to strip or a new house waiting for its cover. Roof sheeting installation looks simple from the ground, but the difference between a roof that stays dry for decades and one that leaks after the first storm is in the purlins, the laps, the screws and the flashings. This page sets out what a sheeting job includes, how roofers price it and what a good one does that a cheap one skips.
What a sheeting job includes
- Stripping and carting the old roof, if there is one (asbestos goes to a registered contractor first).
- Checking the trusses and purlins, and adding or resetting purlins to the data sheet spacing.
- Laying insulation or a foil blanket under the sheets, if you want it.
- The sheets, fixed with the right roofing screws.
- Flashings, ridge capping and barge flashings.
- Gutters and downpipes, if they are in the quote.
Ask which of these are included and who supplies the sheets.
How it is priced
Most roofers quote per m² fitted or a price for the whole job, sometimes labour only with you buying the sheets. What pushes it up: a double storey, a steep pitch, poor access for a truck, a crane to lift long sheets, many hips and valleys, stripping an old roof and repairs to rotten timber. Delivery and cranage outside a metro are often extra. The roof sheeting cost estimator gives a rough budget, and roof sheeting prices explains each line.
Signs of a roofer who knows the trade
Screws go in square through the crest, snug but not crushing the washer, in the pattern the data sheet sets, with more at the edges and the ends. Side laps are turned so the prevailing storm wind crosses the lap instead of driving water under it. Drill swarf is swept off the same day before it rusts orange spots into new IBR roof sheets. Sheets are carried and stored flat, and nobody lifts a long sheet in a strong wind.
Safety and the guarantee
Roof work is work at height. A contractor should use fall protection, ladders tied off and edge protection where the job needs it, and an employer on site has duties under the Construction Regulations. Get a workmanship guarantee in writing, separate from the sheet maker's warranty, stating what it covers and for how long.
What to put in your request
- Give the roof area in m² or the house footprint
- Say single or double storey, and the pitch if known
- Say if an old roof must be stripped first
- Mention who supplies the sheets and flashings
- Ask for a written workmanship guarantee
Roof Sheeting Installation: who asks for them and why
- Homeowners and DIY builders: a new roof on an extension, a reroof of rusted sheets or a garage roof
- Roofers and roofing contractors: subcontract fixing for other roofers on large jobs when the crew is short
- Builders, developers and quantity surveyors: sheeting new houses and RDP extensions on time so the plasterers can start
- Factories, warehouses and steel buildings: long span warehouse and factory roofs fitted with cranes and fall protection
- Shops, offices and business premises: shop, filling station and office roofs fitted around trading hours
- Farms: sheds, barns and animal houses: re-sheeting an implement shed or a poultry house without moving the stock out
- Schools, churches, clinics and halls: school and clinic roofs fitted over a holiday with safety files in order
- Landlords, body corporates and estate managers: staged reroofing of a complex block by block with one guarantee for all
Frequently asked questions
How long does it take to sheet a house roof?
Should the roofer supply the sheets or should I?
Does a new roof need plans or sign off?
Who will quote me?
Work it out first
- Roof pitch and area calculatorFootprint and pitch, or rise and run, in: slope length, sloped area and pitch out
- Purlin spacing calculatorProfile, thickness and roof or wall in: the typical span to check and purlins per slope
- Roofing screw calculatorSheets, purlins and fixing pattern in: main screws, stitching screws and boxes out
- Roof sheeting cost estimatorSheets, flashings, screws and labour in, a rough rand budget from published prices out