Get quotes

Free calculator, nothing to sign up for

Roofing screw calculator

Pick the profile and fixing pattern, then give the eave length or sheets across, the slope and purlin spacing or purlins, and the metres of flashing: the tool counts the main roofing screws or clips, the side lap stitching screws and the flashing fixings, adds spare and rounds up to boxes of 100.

Self drilling roofing screws with sealing washers in a row along the ribs of a new charcoal IBR roof
CalculatorEvery 2ndIBR rib at internal purlins. More at edges and laps
Roofing screws and boxesruns in your browser
Sheets and purlin lines
-
Main fixing screws
-
Side lap stitching screws
-
Flashing screws or rivets
-
Total fasteners
-
Boxes of 100
-

IBR: through the top of every second rib at internal purlins and every rib at the eave, ridge and end lap purlins, side laps stitched about every 600 mm. Corrugated: 3 a sheet at internal purlins and 5 at the ends and laps, one stitch per span on each side lap. Concealed fix: one clip a sheet per purlin, 2 screws a clip (our assumption). Fibre cement: 2 a sheet per purlin. Tile effect and polycarbonate follow a corrugated pattern (ours). Flashings at 500 mm. The data sheet's pattern comes first.

Screws are the smallest line on a roofing quote and the one most often short on the day. The count depends on the profile, how many purlins the sheets cross, where the ends and laps fall and how many flashings there are. This calculator follows published fixing patterns and gives boxes to order. Read about lengths, washers and the coast on roofing screws, how flashings are fixed on roof flashings, and get the purlin count first from the purlin spacing calculator.

The patterns the tool follows

On IBR, screws go through the top of the rib. At internal purlins one roll former's pattern is every second rib; at the eave, the ridge and any end lap, every rib. That is about two screws a sheet plus one at the edge on internal lines, four plus one on end lines. Corrugated in one maker's table takes three a sheet at internal purlins and five at the ends and laps. The large six corrugation fibre cement sheet takes two a sheet at every purlin.

A 12 m IBR gable with 5 m slopes and four purlins a side needs about 440 main screws; side lap stitching and the flashings add about 370 more, so nine boxes of 100 with spare.

Stitching, clips and flashings

  • Side lap stitching screws pull overlapping ribs together between purlins: about every 600 mm on IBR, one a span on corrugated.
  • Concealed fix sheets use clips screwed to the purlins and no screws through the sheet; the tool counts clips and our assumption of two screws each.
  • Ridge capping, barges and wall flashings are fixed about every 500 mm with stitching screws or rivets.

Choosing the right screw

Ask for timber or steel purlin screws to suit the frame, long enough to pass through the rib into the purlin, with a sealing washer and a head colour to match. Near the sea, ask about a heavier coating or stainless. Sweep off the drill filings the same day.

Frequently asked questions

Should I screw every rib everywhere?
On a windy site, an exposed hilltop or the coast, many roofers do, and the tool has that option. The data sheet's fixing pattern for your sheet and site comes first.
Can I use nails on a sheet roof?
Not on a modern steel sheet roof. Nails work loose as the sheets move with heat and wind; self drilling screws with sealing washers are what roll formers specify.
Why are my screws leaking?
Usually an over tightened, crushed washer, a screw in the pan instead of the rib, or a missed purlin. A roofer can replace them with oversize screws or reseal the hole.
Who supplies the screws?
Put the screws on the same request as the sheets: roofing suppliers, roll formers and hardware stores near you price them together. Our part ends at passing that request along; we stock no fasteners.

More calculators

Request roofing screws quotes

Fill in the cut list: the sheets you need, the size of the roof or the lengths, the coating and when you need them. Roofing suppliers, roll formers, steel merchants and roofers that serve your area quote you directly. It is free and there is no obligation.

Cut list 3763Roofing Screws

1The job

2How many (optional, it helps the quote)

Your stackrule of thumb

-
-
-
-
-
-
Estimate
-

A rule of thumb for the request, not a supplier's quote.

3Why, coating and timing

4Your cut list (optional)

  1. L01
  2. L02
Up to 12 lines: sheets by length, flashings, screws, labour.
Needs and options

5Your details

Free and no obligation. By sending you agree that we may share your request with suitable suppliers and roofers. See our privacy policy.

Get free quotes